Production capacity

Bypass valve assembly


More than 60 sets of processing equipment

Process 1: Cover plate end face machining (8 CNC machines)

   Production: 5000 pieces/day (single shift)

Process 2: Valve rocker arm machining (20 CNC machines)

    Capacity: 5000 pieces/day (single shift)

Process 3: Cover plate shaft processing (4 CNC machines)

    Capacity: 3000 pieces/day (single shift)

Process 4: Precision machining of shaft sleeve (sleeve)

    Capacity: 5000 pieces/day (single shift)

Process 5: Assembly

    Production: 5000 pieces/day (single shift)